== P1.9 Check the working of the internal tip-tilt loop == • **Phase** : 2 • **Status** : Draft • **Category** : Unpack, Assemble, and Verification (C1)??? • **Recurrence** : once at commissioning • **Duration** : 1 day **Description** • Check the working of the internal tip-tilt loop using calibration unit light sources, C-RED2, and ALPAO-DM. **Prerequisites** • SCICAM cooled down. **Procedure** • Run the internal tip-tilt loop routine for different brightness of the source (star). * Check its efficiency in keeping the PSF at the C-RED2 hot-pixel. * Save data to repository and analyze them. **Success criteria** * Internal tip-tilt routine works fine and the PSF ar C-RED2 is stable within the required precision. • All the data and analysis saved in the repository. **Notes** **LBTO support** * Liquid Nitrogen refill is required in the cleanroom. **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments**