wiki:docs/CommissioningPlan/P1.7

Version 13 (modified by kradhakrishnan, 3 years ago) (diff)

--

P1.7 Motor/light sources functional verification and filter artifacts/defects verification

  • Phase : 1
  • Status : Draft
  • Category : Unpack, Assemble, and Verification (C1)
  • Recurrence : once
  • Duration : 1.5

Description

  • Checking the working of motors and light sources within SHARK-NIR using optical feedback. Finding the filter defects/artifacts using an internal calibration source (flat-field) within the instrument.

Prerequisites

  • SHARK-NIR connected to LBT network.
  • Electronics racks on.
  • DM best shape uploaded (shape minimizing internal aberrations)
  • The cryostat should be running and cooled down.

Procedure

  • When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions.
  • The light sources within SHARK-NIR are used simultaneously to check the working of the motors looking at the optical feedback.
  • Check the CRED-2 and ALPAO-DM SW and optical feedback.
  • Take the images of all the filters using the internal calibration source (flat-field) within the instrument to locate/find out the filter defects/artifacts, if any. You may take short- and long-exposures to get better contrast of the features if required.
  • Check the filter wheel position monitoring script detailed in SNM1. Save the data in the repository.

Success criteria

  • All the motors can reach the named positions / nominal positions.
  • All the light sources are working and confirmed through optical feedback at the SCICAM.
  • Filter wheel position monitoring script is run successfully and data saved in the repository.
  • CRED-2 AND ALPAO-DM working normally.
  • All the filter images saved.

Notes

Templates

LBTO support

  • Liquid Nitrogen refill is required in the cleanroom.

Associated SHARK-NIR personnel

Date performed and by whom

Comments