Version 1 (modified by kradhakrishnan, 5 years ago) (diff) |
---|
P1.7 Verification of the operability of the motors and light sources
- Phase : 1
- Status : Draft
- Category : Installation, integration, verification (C1)
- Recurrence : once
- Duration : 1 hour(s)
Description
- Checking the working of motors and light sources within SHARK-NIR
Prerequisites
- SHARK-NIR connected to LBT network.
- Electronics cabinets on.
- The cryostat should be running and cooled down.
Procedure
- When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions.
- The light sources within SHARK-NIR may be used simultaneously to check the working of the motors looking at the optical feedback.
Success criteria
- All the motors can reach their software limits, named positions / nominal positions.
- All the light sources are working and confirmed through optical feedback at the SCICAM.
Notes LBTO support Associated SHARK-NIR personnel
- JF, LM, MdP,
Date performed and by whom