== P1.7 Verification of the operability of the motors and light sources == • **Phase** : 1 • **Status** : Draft • **Category** : Installation, integration, verification (C1) • **Recurrence** : once • **Duration** : 1 hour(s) **Description** • Checking the working of motors and light sources within SHARK-NIR **Prerequisites** • SHARK-NIR connected to LBT network. • Electronics cabinets on. • The cryostat should be running and cooled down. **Procedure** • When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions. • The light sources within SHARK-NIR may be used simultaneously to check the working of the motors looking at the optical feedback. **Success criteria** • All the motors can reach their software limits, named positions / nominal positions. • All the light sources are working and confirmed through optical feedback at the SCICAM. **Notes** **LBTO support** **Associated SHARK-NIR personnel** • JF, LM, MdP, **Date performed and by whom**