Changes between Version 4 and Version 5 of docs/CommissioningPlan/P1.7
- Timestamp:
- 01/25/21 13:38:48 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.7
v4 v5 13 13 **Procedure** 14 14 • When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions. 15 • The light sources within SHARK-NIR may be used simultaneously to check the working of the motors looking at the optical feedback. 15 • The light sources within SHARK-NIR are used simultaneously to check the working of the motors looking at the optical feedback. 16 * Check the CRED-2 and ALPAO-DM SW and optical feedback. 16 17 **Success criteria** 17 • All the motors can reach the ir software limits,named positions / nominal positions.18 • All the motors can reach the named positions / nominal positions. 18 19 • All the light sources are working and confirmed through optical feedback at the SCICAM. 20 * CRED-2 AND ALPAO-DM working normally. 21 19 22 **Notes** 20 23 … … 28 31 **Comments** 29 32 30 MB: reaching limit switches/named/nominal positions could be part of P1.5, as well as switching on and off of the lamps. I would add to 1.5 also testing the commands to C-red2 and DM are sent without errors. Here we should just check by optical feedback if everything is performing as expected. When you say electronic cabinet on, you mean single electronics.31