Changes between Version 14 and Version 15 of docs/CommissioningPlan/P1.7
- Timestamp:
- 01/18/22 15:01:58 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.7
v14 v15 5 5 - **Category** : Unpack, Assemble, and Verification (C1) 6 6 - **Recurrence** : once 7 - **Duration** : 1.5 7 - **Duration** : 1.5 days 8 8 9 9 **Description** … … 17 17 18 18 **Procedure** 19 - When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions.19 - When the services are up and running, after the motors are sent to home positions, each of the individual motors is individually tested for their different named/nominal positions. 20 20 - The light sources within SHARK-NIR are used simultaneously to check the working of the motors looking at the optical feedback. 21 - Check the CRED-2 and ALPAO-DM SW andoptical feedback.21 - Check the CRED-2 and ALPAO-DM SW using optical feedback. 22 22 - Take the images of all the filters using the internal calibration source (flat-field) within the instrument to locate/find out the filter defects/artefacts, if any. You may take short- and long-exposures to get better contrast of the features if required. 23 23 - Check the filter wheel position monitoring script detailed in [wiki:/docs/Commissioning/SNM1 SNM1]. Save the data in the repository.