== P1.6 Cool down the cryostat == • **Phase** : 1 • **Status** : Draft • **Category** : Unpack, Assemble, Verification, and Installation (C1) • **Recurrence** : once • **Duration** : 1 day **Description** • Cooldown the cryostat. **Prerequisites** • SHARK-NIR connected to LBT network. • Electronics cabinets on. • Needs vacuum pumping at the beginning (vacuum pressure of 10e-5 is good, but the required amount is 10e-3 only.) • Liquid nitrogen pumped? **Procedure** • Run the cryostat cooling down sequence • Check how the system is performing every 30 minutes **Success criteria** • Cryostat cooled down without any issues. • The temperature at the detector is stable at 77K **Notes** **LBTO support** • Liquid Nitrogen refill is required at the cleanroom. **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments** MB:not sure of the meaning of sentence in LBTO support MB: i have a few comments, easier to discuss by chat/video