Version 7 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
P1.5 Start all the services and initialize all the motors
- Phase : 1
- Status : Draft
- Category : Unpack, Assemble, Verification, and Installation (C1)
- Recurrence : once
- Duration : half a day
Description
- When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.
Prerequisites
- SHARK-NIR connected to the LBT network (P1.4 should be completed).
- Electronics cabinets on.
- A script to initialize the motors.
Procedure
- Switch on the electronics cabinets and individual components.
- Start individual services.
- Initialize every motor (possibly by running a script).
- Check also the script which puts every moving component in their resting postions.
Success criteria
- All the services are up and running with no fatal errors and understand the errors or warnings if any.
- All the motors are working, initialized, and sent to the nominal positions.
Notes
LBTO support
Associated SHARK-NIR personnel
Date performed and by whom
Comments
MB: i would excpect to have a button for full inizialization and several buttons for single motors inizialization instead of a script. But let's verify with MdP [I agree]