wiki:docs/CommissioningPlan/P1.5

Version 20 (modified by kradhakrishnan, 3 years ago) (diff)

--

P1.5 SW checks and motors initializations

  • Phase : 1
  • Status : Draft
  • Category : Unpack, Assemble, and Verification (C1)
  • Recurrence : once
  • Duration : 1 day

Description

  • When the electronics are switched on, verify individual services working and initialize the motors, send to nominal positions, and verify the logging.

Prerequisites

  • SHARK-NIR connected to the LBT network (P1.4 should be completed).
  • Electronics on.
  • A script to initialize the motors.

Procedure

  • Switch on the electronics cabinets and individual components.
  • Start individual services.
  • Initialize all motors together (using the buttons in the final SW GUI).
  • Check also the button which puts every moving component in its resting position.
  • Check in the final version of the SW GUI if the individual initialization buttons work.
  • Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs.
  • Check if the SW part of switching ON and OFF lamps in the calibration unit works.
  • Check the electronics/SW of the CRED-2 and ALPAO-DM (& RTC). Make sure that they both can be individually switched on and off remotely.
  • Start the SCICAM electronics and acquire (and store) an image in warm conditions.

Templates

Success criteria

  • All the services are up and running with no fatal errors and understand the errors or warnings if any.
  • All the motors are working, initialized, and sent to the nominal positions.
  • CRED-2 and ALPAO-DM electronics and SW working as expected.

Notes

LBTO support

Date performed and by whom