== P1.5 SW checks and motors initializations == - **Phase** : 1 - **Status** : Draft - **Category** : Unpack, Assemble, and Verification (C1) - **Recurrence** : once - **Duration** : 1 day **Description** - When the electronics are switched on, verify individual services working and initialize the motors, send to nominal positions, and verify the logging. **Prerequisites** - SHARK-NIR connected to the LBT network (P1.4 should be completed). - Electronics on. - A script to initialize the motors. **Procedure** - Switch on the electronics cabinets and individual components. - Start individual services. - Initialize all motors together (using the buttons in the final SW GUI). - Check also the button which puts every moving component in its resting position. - Check in the final version of the SW GUI if the individual initialization buttons work. - Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. - Check if the SW part of switching ON and OFF lamps in the calibration unit works. - Check the electronics/SW of the CRED-2 and ALPAO-DM (& RTC). Make sure that they both can be individually switched on and off remotely. - Start the SCICAM electronics and acquire (and store) an image in warm conditions. **Templates** **Success criteria** - All the services are up and running with no fatal errors and understand the errors or warnings if any. - All the motors are working, initialized, and sent to the nominal positions. - CRED-2 and ALPAO-DM electronics and SW working as expected. **Notes** **LBTO support** **Date performed and by whom**