== P1.5 Start all the services and initialize all the motors == • **Phase** : 1 • **Status** : Draft • **Category** : Unpack, Assemble, Verification, and Installation (C1) • **Recurrence** : once • **Duration** : half a day **Description** • When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions. **Prerequisites** • SHARK-NIR connected to the LBT network (P1.4 should be completed). • Electronics cabinets on. • A script to initialize the motors. **Procedure** • Switch on the electronics cabinets and individual components. • Start individual services. • Initialize all motors together (using the buttons in the final SW GUI). * Check also the button which puts every moving component in their resting positions. * Check in the final version of the SW GUI if the individual initialization buttons work. * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. **Success criteria** • All the services are up and running with no fatal errors and understand the errors or warnings if any. • All the motors are working, initialized, and sent to the nominal positions. **Notes** **LBTO support** **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments**