Changes between Version 2 and Version 3 of docs/CommissioningPlan/P1.5


Ignore:
Timestamp:
01/15/21 15:05:07 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.5

    v2 v3  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Installation, integration, verification (C1)                           
     4•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)                           
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       20 minutes
     6•       **Duration**            :       half a day
    77**Description**
    88•       When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.
     
    2121**LBTO support**
    2222**Associated SHARK-NIR personnel**
    23 •       JF, LM, MdP,
     23
    2424**Date performed and by whom**