    1 == P1.5 Start all the services and initialize all the motors ==
    2 •       **Phase**               :       1 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Unpack, Assemble, and Verification (C1)
    5 •       **Recurrence**  :       once
    6 •       **Duration**            :       1 day
     1== P1.5 SW checks and motors initializations ==
     2
     3- **Phase**             :       1 
     4- **Status**            :       Draft   
     5- **Category**  :       Unpack, Assemble, and Verification (C1)
     6- **Recurrence**        :       once
     7- **Duration**  :       1 day
     8
    79**Description**
    8 •       When the electronics are switched on, verify individual services working and initialize the motors, send to nominal positions, etc.
     10- When the electronics are switched on, verify individual services working and initialize the motors, send to nominal positions, etc.
     11
    912**Prerequisites**
    10 •       SHARK-NIR connected to the LBT network (P1.4 should be completed).
    11 •       Electronics on.
    12 •       A script to initialize the motors.
     13- SHARK-NIR connected to the LBT network (P1.4 should be completed).
     14- Electronics on.
     15- A script to initialize the motors.
     16
    1317**Procedure**
    14 •       Switch on the electronics cabinets and individual components.
    15 •       Start individual services.
    16 •       Initialize all motors together (using the buttons in the final SW GUI).
    17 * Check also the button which puts every moving component in their resting positions.
    18 * Check in the final version of the SW GUI if the individual initialization buttons work.
    19 * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs.
    20 * Check if the SW part of switching ON and OFF lamps in the calibration unit works.
    21 * Check the electronics/SW of the CRED-2 and ALPAO-DM (& RTC). Make sure that they both can be individually switched on and off remotely.
    22 * Start the SCICAM electronics and acquire (and store) an image in warm conditions.
     18- Switch on the electronics cabinets and individual components.
     19- Start individual services.
     20- Initialize all motors together (using the buttons in the final SW GUI).
     21- Check also the button which puts every moving component in their resting positions.
     22- Check in the final version of the SW GUI if the individual initialization buttons work.
     23- Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs.
     24- Check if the SW part of switching ON and OFF lamps in the calibration unit works.
     25- Check the electronics/SW of the CRED-2 and ALPAO-DM (& RTC). Make sure that they both can be individually switched on and off remotely.
     26- Start the SCICAM electronics and acquire (and store) an image in warm conditions.
     27
     28**Templates**
    2329
    2430**Success criteria**
    25 •       All the services are up and running with no fatal errors and understand the errors or warnings if any.
    26 •       All the motors are working, initialized, and sent to the nominal positions.
    27 * CRED-2 and ALPAO-DM electronics and SW working as expected.
     31- All the services are up and running with no fatal errors and understand the errors or warnings if any.
     32- All the motors are working, initialized, and sent to the nominal positions.
     33- CRED-2 and ALPAO-DM electronics and SW working as expected.
     34
    2835**Notes**
    29 
    30 **Templates**
    31 -
    3236
    3337**LBTO support**
    3438
    35 **Associated SHARK-NIR personnel**
    36 
    3739**Date performed and by whom**
    38 
    39 
    40 **Comments**