Changes between Version 16 and Version 17 of docs/CommissioningPlan/P1.5
- Timestamp:
- 02/03/21 11:45:51 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.5
v16 v17 6 6 • **Duration** : 1 day 7 7 **Description** 8 • When the electronics cabinets are switched on, verify individual services working and initialize the motors to nominal positions.8 • When the electronics are switched on, verify individual services working and initialize the motors, send to nominal positions, etc. 9 9 **Prerequisites** 10 10 • SHARK-NIR connected to the LBT network (P1.4 should be completed). 11 • Electronics cabinetson.11 • Electronics on. 12 12 • A script to initialize the motors. 13 13 **Procedure** … … 18 18 * Check in the final version of the SW GUI if the individual initialization buttons work. 19 19 * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. 20 * Check the electronics/SW of the CRED-2 and ALPAO-DM. Make sure that they both can be individually switched on and off remotely. 20 * Check if the SW part of switching ON and OFF lamps in the calibration unit works. 21 * Check the electronics/SW of the CRED-2 and ALPAO-DM (& RTC). Make sure that they both can be individually switched on and off remotely. 21 22 * Start the SCICAM electronics and acquire (and store) an image in warm conditions. 22 23 … … 24 25 • All the services are up and running with no fatal errors and understand the errors or warnings if any. 25 26 • All the motors are working, initialized, and sent to the nominal positions. 26 * CRED-2 and ALPAO-DM electronics and SW working as expected. 27 * CRED-2 and ALPAO-DM electronics and SW working as expected. 27 28 **Notes** 28 29 … … 35 36 36 37 **Comments** 37 * LM: add in the procedure also starting of SCICAM electronics and try to acquire and store an image (in warm conditions of course) [DONE]