Changes between Version 10 and Version 11 of docs/CommissioningPlan/P1.5


Ignore:
Timestamp:
01/25/21 13:35:53 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.5

    v10 v11  
    1414•       Switch on the electronics cabinets and individual components.
    1515•       Start individual services.
    16 •       Initialize every motor (using the buttons in the final SW GUI).
    17 * Check also the script which puts every moving component in their resting positions.
     16•       Initialize all motors together (using the buttons in the final SW GUI).
     17* Check also the button which puts every moving component in their resting positions.
    1818* Check in the final version of the SW GUI if the individual initialization buttons work.
     19* Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs.
     20
    1921**Success criteria**
    2022•       All the services are up and running with no fatal errors and understand the errors or warnings if any.