Changes between Version 10 and Version 11 of docs/CommissioningPlan/P1.5
- Timestamp:
- 01/25/21 13:35:53 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.5
v10 v11 14 14 • Switch on the electronics cabinets and individual components. 15 15 • Start individual services. 16 • Initialize every motor (using the buttons in the final SW GUI).17 * Check also the scriptwhich puts every moving component in their resting positions.16 • Initialize all motors together (using the buttons in the final SW GUI). 17 * Check also the button which puts every moving component in their resting positions. 18 18 * Check in the final version of the SW GUI if the individual initialization buttons work. 19 * Check if the SW (HW if present and need to be checked) limit switches are triggered and check the logs. 20 19 21 **Success criteria** 20 22 • All the services are up and running with no fatal errors and understand the errors or warnings if any.