== P1.4 Cable in the instrument, power on, install workstations, and connect to LBT network == • **Phase** : 1 • **Status** : Draft • **Category** : Unpack, Assemble, Verification, and Installation (C1) • **Recurrence** : once • **Duration** : half a day **Description** • At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations and connect SHARK-NIR to the LBT network. **Prerequisites** • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network. **Procedure** • Carefully cable in SHARK-NIR. • Switch on the electronics cabinets. • Install the instrument workstation in the server room and scientific camera workstation in control room level 2. • Install the scientific camera workstation in control room level 2. • Connect SHARK-NIR to the LBT network. **Success criteria** • Electronics cabinets are powered on (working of led lights, fans, etc.). • SHARK-NIR can be accessed through the LBT network (e.g. Switching on/off services remotely from the control room). **Notes** **LBTO support** • IT Support to connect to the LBT network. • Any electronics support needed? **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments** MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room.