== P1.4 Cable in the instrument, power on, and connect to LBT network == • **Phase** : 1 • **Status** : Draft • **Category** : Installation, integration, verification (C1) • **Recurrence** : once • **Duration** : 2 hour(s) **Description** • At the LBT clean room, cable in the instrument. Power on the cabinets, and connect SHARK-NIR to LBT network. **Prerequisites** • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to LBT network. **Procedure** • Carefully cable in SHARK-NIR. • Switch on the electronics cabinets. • Connect SHARK-NIR to the LBT network. **Success criteria** • Electronics cabinets are powered on (working of led lights, fans, etc.). • SHARK-NIR can be accessed through LBT network (e.g. Switching on/off services remotely from the control room). **Notes** **LBTO support** • Support to connect to LBT network. • Any electronics support needed? **Associated SHARK-NIR personnel** • JF, LM, MdP, **Date performed and by whom**