Changes between Version 6 and Version 7 of docs/CommissioningPlan/P1.4


Ignore:
Timestamp:
01/22/21 19:24:30 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.4

    v6 v7  
    1212•       Carefully cable in SHARK-NIR.
    1313•       Switch on the electronics cabinets.
    14 •       Install the instrument workstation in the server room and scientific camera workstation in control room level 2.
    15 •       Install the scientific camera workstation in control room level 2.
     14•       Install the instrument workstation (and its copy/backup?) and the scientific camera (SCICAM) workstation in the server room.
    1615•       Connect SHARK-NIR to the LBT network.
     16*  Ready essential laptops ready with all the relevant software for the cleanroom activity. Check the connection with both the workstations mentioned earlier.
    1717**Success criteria**
    1818•       Electronics cabinets are powered on (working of led lights, fans, etc.).
     
    2828
    2929**Comments**
    30 MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room.
     30
     31MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room.  [DONE]