docs/CommissioningPlan/P1.4
v6 v7 12 12 • Carefully cable in SHARK-NIR. 13 13 • Switch on the electronics cabinets. 14 • Install the instrument workstation in the server room and scientific camera workstation in control room level 2. 15 • Install the scientific camera workstation in control room level 2. 14 • Install the instrument workstation (and its copy/backup?) and the scientific camera (SCICAM) workstation in the server room. 16 15 • Connect SHARK-NIR to the LBT network. 16 * Ready essential laptops ready with all the relevant software for the cleanroom activity. Check the connection with both the workstations mentioned earlier. 17 17 **Success criteria** 18 18 • Electronics cabinets are powered on (working of led lights, fans, etc.). … … 28 28 29 29 **Comments** 30 MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room. 30 31 MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room. [DONE]