Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.4


Ignore:
Timestamp:
01/21/21 18:32:06 (4 years ago)
Author:
mbergomi
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.4

    v5 v6  
    2828
    2929**Comments**
    30 There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room.
     30MB: There seems tobe confusing info on workstations. Both SHARK-NIR amain and camera ones need to be installed in server room. Also, we might want to dedicate a couple laptops minimum with everything already installed (e.g. super8-super9) to be used from clean room.