    v32 v33  
    4545** Results**
    4646- Box-16: Davide installed the two workstations into server room B with the help of LeRoy. After a bit of misunderstanding, we will use the 192.168.61.X subnet as foreseen. When Sasha workstation arrives, it will be initially mounted on the clean room rack because of the missing mono-mode fiber connection from the server room.
     47- We performed all cabling of the instrument to the electronics and switch on the power.
     48- We opened the carter of the instrument and identified a loose screw.
     49- We identified a missing screw on ND4 filter support, Checking old pictures before shipment (June 06) we confirmed that the screw was present before shipment.
     50- We rotated the SCIFI-II wheel with Mikromove and re-inserted the screw.
     51- We identified other loose screws on the SCIFI wheels and closed them.
     52- Cisco switch was reconfigured by IT staff (Le Roy, remotely supported)  in order to match 192.168.61.x LBTO parameters (which is on a separate VLAN, while in OAPD we did not have it).
     53- We let some free ports as DHCP on 192.168.49.x on Cisco if a laptop connection is needed.
     54- It was necessary to add gateway 192.168.61.1 to all our devices.
     55- Currently we do not have a nameserver, so we have to use IP addresses. Soon, we will have something such as .shark-nir.lbto.org
     56- Shutdown and startup scripts have been tested. Several templates have been tested. All motors are moving as expected.
     57- We tested the functionality of the LS-180 stage (deployable arm) with Mercury and Mikromove, and all was fine. It was reinserted in Box-3, which can now be stored until the next run.
     58- We had a couple of minor issues (one with bearing limit switches, which were adjusted, and one with one ADC motor, both solved). We defined new SW limit switches to be included for bearing derotation: [131 deg, 318.5 deg].
     59- We installed a support flange (removing part of it because of mechanical interference) to hold a technical camera (AVT Alvium 1800 U-2040m (pixel size of 2.74 um) in place of the SCICAM and acquired an image of the PSF, which looks nice. The next step is the scientific analysis of FWHM both broadband and with a narrow (10 nm) 633nm filter.
     60- Manny, Ken, and the SCICAM will likely come up the summit on Thursday 30th (30-06-2022) afternoon, it will be then vacuumed and cooled down.
     61
    4762
    4863**Date performed and by whom**
    4964- Davide Ricci,
    50 - LeRoy, other LBTO staff
     65- Le Roy, other LBTO staff