    v31 v32  
    4343[[Image(SHARK-NIR_Computer_Structure.png​,50%)]]
    4444
     45** Results**
     46- Box-16: Davide installed the two workstations into server room B with the help of LeRoy. After a bit of misunderstanding, we will use the 192.168.61.X subnet as foreseen. When Sasha workstation arrives, it will be initially mounted on the clean room rack because of the missing mono-mode fiber connection from the server room.
     47
    4548**Date performed and by whom**
    46 
     49- Davide Ricci,
     50- LeRoy, other LBTO staff