Changes between Version 30 and Version 31 of docs/CommissioningPlan/P1.4
- Timestamp:
- 05/12/22 19:48:13 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v30 v31 28 28 **Notes** 29 29 - SCICAM is redundant with other SCICAM computers inside of LBTI. There will not be a separate SCICAM workstation copy/backup. 30 - Precautionary Warning (for INAF people): Before switching on the Mocon electronics and Lakeshore, check that they are set to 115V use.30 - Precautionary Warning (for INAF people): __Before switching on the Mocon electronics and Lakeshore, check that they are set to 115V use.__ 31 31 - Check P1.5 for more details on vacuum pumping for cryostat cooldown. 32 32