    3434- IT support to install/set the workstations in the proper location, connect to the LBT network.
    3535- At the server room, we need 9 free network ports to connect SHARKNIRWS, SHARKNIRWS2, SASHAWS to the LBTO network. Also, we need 6 free standard electric plugs.
    36 - At the cleanroom, we will need 1 power plug for the surge suppressor, and the maximum expected load will be of the order of 880W. Our PDUs connected to the surge suppressor. Also, couple of other normal power plugs for connecting laptops, monitors, etc. An extension power strip, if available, will be good.
     36- At the cleanroom, we will need 1 power plug for the surge suppressor, and the maximum expected load will be of the order of 880W. Our PDUs will be connected to the surge suppressor. Also, a couple of other normal power plugs for connecting laptops, monitors, etc. are required along with an extension power strip.
    3737- LBTO SW support may be needed.