    3030**LBTO support**
    3131- Need 2 free and accessible network ports to connect (a) the SHARK-NIR instrument network switch to the LBTO network, and (b) a working laptop/computer to the LBTO network.
    32 - WE need fiber link connection from the cleanroom to the server room.
     32- We need fiber link connection from the cleanroom to the server room.
    3333- IT support to install/set the workstations in the proper location, connect to the LBT network.
    3434- At the server room, we need 6 free network ports to connect SHARKNIRWS, SHARKNIRWS2, SASHAWS to the LBTO network. Also, we need 6 free standard electric plugs.