docs/CommissioningPlan/P1.4
v24 v25 30 30 **LBTO support** 31 31 - Need 2 free and accessible network ports to connect (a) the SHARK-NIR instrument network switch to the LBTO network, and (b) a working laptop/computer to the LBTO network. 32 - WE need fiber link connection from the cleanroom to the server room. 32 33 - IT support to install/set the workstations in the proper location, connect to the LBT network. 33 34 - At the server room, we need 6 free network ports to connect SHARKNIRWS, SHARKNIRWS2, SASHAWS to the LBTO network. Also, we need 6 free standard electric plugs.