Changes between Version 24 and Version 25 of docs/CommissioningPlan/P1.4


Ignore:
Timestamp:
02/15/22 12:05:03 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.4

    v24 v25  
    3030**LBTO support**
    3131- Need 2 free and accessible network ports to connect (a) the SHARK-NIR instrument network switch to the LBTO network, and (b) a working laptop/computer to the LBTO network.
     32- WE need fiber link connection from the cleanroom to the server room.
    3233- IT support to install/set the workstations in the proper location, connect to the LBT network.
    3334- At the server room, we need 6 free network ports to connect SHARKNIRWS, SHARKNIRWS2, SASHAWS to the LBTO network. Also, we need 6 free standard electric plugs.