Changes between Version 18 and Version 19 of docs/CommissioningPlan/P1.4
- Timestamp:
- 02/09/22 19:50:28 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v18 v19 7 7 8 8 **Description** 9 - At the LBT clean room, cable in the instrument. Power on the electronics, install workstations and connect SHARK-NIR to the LBT network.9 - At the LBT clean room, cable in the instrument. Power on the electronics, install workstations (in the server room) and connect SHARK-NIR to the LBT network. 10 10 11 11 **Prerequisites**