Changes between Version 18 and Version 19 of docs/CommissioningPlan/P1.4


Ignore:
Timestamp:
02/09/22 19:50:28 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.4

    v18 v19  
    77
    88**Description**
    9 - At the LBT clean room, cable in the instrument. Power on the electronics, install workstations and connect SHARK-NIR to the LBT network.
     9- At the LBT clean room, cable in the instrument. Power on the electronics, install workstations (in the server room) and connect SHARK-NIR to the LBT network.
    1010
    1111**Prerequisites**