Changes between Version 16 and Version 17 of docs/CommissioningPlan/P1.4
- Timestamp:
- 01/14/22 12:38:07 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v16 v17 1 1 == P1.4 Cable in the instrument, power on, install workstations, and connect to LBT network == 2 • **Phase** : 1 3 • **Status** : Draft 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 • **Recurrence** : once 6 • **Duration** : 1 day 2 - **Phase** : 1 3 - **Status** : Draft 4 - **Category** : Unpack, Assemble, and Verification (C1) 5 - **Recurrence** : once 6 - **Duration** : 1 day 7 7 8 **Description** 8 • At the LBT clean room, cable in the instrument. Power on the electronics, install workstations and connect SHARK-NIR to the LBT network. 9 - At the LBT clean room, cable in the instrument. Power on the electronics, install workstations and connect SHARK-NIR to the LBT network. 10 9 11 **Prerequisites** 10 • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network. 12 - All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network. 13 11 14 **Procedure** 12 • Carefully cable in SHARK-NIR. 13 • Switch on the electronics. 14 • Install the instrument workstation (and its copy/backup) and the scientific camera (SCICAM) workstation in the server room. 15 • Connect SHARK-NIR to the LBT network. 16 * Ready essential laptops ready with all the relevant software for the cleanroom activity. Check the connection with both the workstations mentioned earlier. 15 - Carefully cable in SHARK-NIR. 16 - Switch on the electronics. 17 - Install the instrument workstation (and its copy/backup) and the scientific camera (SCICAM) workstation in the server room. 18 - Connect SHARK-NIR to the LBT network. 19 - Ready essential laptops ready with all the relevant software for the cleanroom activity. Check the connection with both the workstations mentioned earlier. 20 21 **Templates** 22 17 23 **Success criteria** 18 • Electronics is powered on (working of led lights, fans, etc.). 19 • SHARK-NIR can be accessed through the LBT network (e.g. Switching on/off services remotely from the control room). 24 - Electronics is powered on (working of led lights, fans, etc.). 25 - SHARK-NIR can be accessed through the LBT network (e.g. Switching on/off services remotely from the control room). 26 20 27 **Notes** 21 * SCICAM is redundant with other SCICam computers inside of LBTI. There will not be a separate SCICAM workstation copy/backup. 28 - SCICAM is redundant with other SCICam computers inside of LBTI. There will not be a separate SCICAM workstation copy/backup. 29 22 30 **LBTO support** 23 * IT support to install/set the workstations in the proper location, connect to the LBT network. 24 * LBTO SW support may be needed. 25 **Associated SHARK-NIR personnel** 31 - IT support to install/set the workstations in the proper location, connect to the LBT network. 32 - LBTO SW support may be needed. 26 33 27 34 **Date performed and by whom** 28 35 29 **Comments**30