Changes between Version 12 and Version 13 of docs/CommissioningPlan/P1.4
- Timestamp:
- 02/03/21 11:39:41 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.4
v12 v13 4 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 5 • **Recurrence** : once 6 • **Duration** : half aday6 • **Duration** : 1 day 7 7 **Description** 8 • At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to the LBT network.8 • At the LBT clean room, cable in the instrument. Power on the electronics, install workstations, and connect SHARK-NIR to the LBT network. 9 9 **Prerequisites** 10 10 • All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network.