  • docs/CommissioningPlan/P1.4

    v12 v13  
    44•       **Category**            :       Unpack, Assemble, and Verification (C1)
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       half a day
     6•       **Duration**            :       1 day
    77**Description**
    8 •       At the LBT clean room, cable in the instrument. Power on the cabinets, install workstations, and connect SHARK-NIR to the LBT network.
     8•       At the LBT clean room, cable in the instrument. Power on the electronics, install workstations, and connect SHARK-NIR to the LBT network.
    99**Prerequisites**
    1010•       All the necessary tools and safety features to do the cabling. A free and accessible network port to connect SHARK-NIR to the LBT network.