Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.3
- Timestamp:
- 01/22/21 19:20:03 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v5 v6 8 8 • Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom. 9 9 **Prerequisites** 10 • All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to cleanroom).10 • All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom). 11 11 **Procedure** 12 12 • Carefully assemble and integrate the various opto-mechanical components. 13 • Install them one by one onto the mechanical structure (either at mountain bay or at the clean 13 • Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom). 14 14 • Install the electronics cabinet. 15 15 **Success criteria** … … 26 26 27 27 **Comments** 28 MB: when saying optomech components you mean cryostat to bearing for example? 28 29 MB: when saying optomech components you mean cryostat to bearing for example? [Yes, for example]