    88•       Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
    99**Prerequisites**
    10 •       All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to cleanroom).
     10•       All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).
    1111**Procedure**
    1212•       Carefully assemble and integrate the various opto-mechanical components.
    13 •       Install them one by one onto the mechanical structure (either at mountain bay or at the clean room).
     13•       Install them one by one onto the mechanical structure (either at mountain bay or at the cleanroom).
    1414•       Install the electronics cabinet.
    1515**Success criteria**
     
    2626
    2727**Comments**
    28 MB: when saying optomech components you mean cryostat to bearing for example?
     28
     29MB: when saying optomech components you mean cryostat to bearing for example? [Yes, for example]