    5151** Result**
    52 - Newport optical bench, a table, monitor, and keyboard were brought by the LBT team to populate the clean tent as per SHARK-NIR requests. UPS will arrive soon.
     52- Newport optical bench, a table, monitor, and keyboard were brought by the LBT team to populate the clean tent as per SHARK-NIR requests. UPS is already baseline for the  clean tent plug.
    5353- SHARK-NIR on its handling and Zarges boxes 10,11,12,13,16 were brought into the clean room.
    5454- Electronics were mounted on the rack.