Changes between Version 36 and Version 37 of docs/CommissioningPlan/P1.3
- Timestamp:
- 05/12/22 19:39:59 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v36 v37 27 27 - See AD11 for more details. 28 28 - Info from Laura Funk (via Slack): "Pat measured the footprint of the clean tent. It measures 2.7m X 3.5m (inside the tent and frame boundary)". Added on 2 March 2022 29 - Precautionary Warning to INAD-PD People: __Before installing electronics in the cabinet, do NOT forget to remove the fan from above DM electronics. To perform this operation requires opening the DM electronics (see image below).__ 29 30 30 31 **LBTO support** … … 45 46 [[Image(Shark-nir_ElectronicsRack_Padova.JPEG,20%)]] 46 47 48 [[Image(SHAR-NIR_remove_fan_over_DM_electronics.jpg,20%)]] 49 47 50 **Date performed and by whom** 48 51