Changes between Version 24 and Version 25 of docs/CommissioningPlan/P1.3


Ignore:
Timestamp:
02/14/22 14:56:25 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.3

    v24 v25  
    2828
    2929**LBTO support**
    30 - Crane operator to lift and move stuff (mountain bay and/or cleanroom).
     30- Crane operator to lift and move stuff (mountain bay and/or cleanroom). In particular, a crane operator is needed to install the instrument and other components to their handling. Refer to AD11 for details.
    3131- Forklift to move boxes.
    3232- 1-2 crew to support installation procedure (mountain bay and/or cleanroom).
    3333- Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.
    34 - Optical bench and access to the clean tent.
     34- Optical bench - Newport model RS 4000 and is 4' x 6' in size already available in LBTO is fine.
     35- Access to the clean tent (of an area of 4.5m x 2.5m would be sufficient).
    3536- If LBTO has an electronics rack available to mount the SHARK-NIR electronics for the duration from unboxing to installation at the telescope platform, SHARK-NIR can avoid shipping what we have from Padova. What we have in Padova has the following dimensions 58cm x 71cm x 185cm approximately, but a shorter one would still be acceptable for us. Below is the photo of our rack in Padova.
    3637