Changes between Version 24 and Version 25 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/14/22 14:56:25 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v24 v25 28 28 29 29 **LBTO support** 30 - Crane operator to lift and move stuff (mountain bay and/or cleanroom). 30 - Crane operator to lift and move stuff (mountain bay and/or cleanroom). In particular, a crane operator is needed to install the instrument and other components to their handling. Refer to AD11 for details. 31 31 - Forklift to move boxes. 32 32 - 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 33 33 - Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 34 - Optical bench and access to the clean tent. 34 - Optical bench - Newport model RS 4000 and is 4' x 6' in size already available in LBTO is fine. 35 - Access to the clean tent (of an area of 4.5m x 2.5m would be sufficient). 35 36 - If LBTO has an electronics rack available to mount the SHARK-NIR electronics for the duration from unboxing to installation at the telescope platform, SHARK-NIR can avoid shipping what we have from Padova. What we have in Padova has the following dimensions 58cm x 71cm x 185cm approximately, but a shorter one would still be acceptable for us. Below is the photo of our rack in Padova. 36 37