Changes between Version 22 and Version 23 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/14/22 14:47:26 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v22 v23 7 7 8 8 **Description** 9 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets, and move the unit to the cleanroom.9 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics into a temporary rack, and move the unit to the cleanroom. 10 10 11 11 **Prerequisites** … … 14 14 **Procedure** 15 15 - Carefully integrate the cryostat unit with the derotator-optical bench unit. 16 - Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet(its final destination) shared with iLocater for sanity checks.16 - Before installing the electronics into a temporary rack in the cleanroom, take it to the LBT Platform cabinet at Level-6 (its final destination) shared with iLocater for sanity checks. 17 17 - Set up the electronics racks in the cleanroom. 18 18 … … 29 29 **LBTO support** 30 30 - Crane operator to lift and move stuff (mountain bay and/or cleanroom). 31 - Forklift to move boxes. 31 32 - 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 32 33 - Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 33 34 - Optical bench and access to the clean tent. 35 - If LBTO has an electronics rack available to mount the SHARK-NIR electronics for the duration from unboxing to installation at the telescope platform, SHARK-NIR can avoid shipping what we have from Padova. What we have in Padova has the following dimensions 58cm x 71cm x 185cm approximately, but a shorter one would still be acceptable for us. Below is the photo of our rack in Padova. 36 37 [[Image(Shark-nir_ElectronicsRack_Padova.JPEG,50%)]] 34 38 35 39 **Date performed and by whom**