Changes between Version 18 and Version 19 of docs/CommissioningPlan/P1.3


Ignore:
Timestamp:
01/18/22 14:49:25 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.3

    v18 v19  
    77
    88**Description**
    9 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
     9- Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets, and move the unit to the cleanroom.
    1010
    1111**Prerequisites**
    12 - All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).
     12- All the necessary tools and safety features to do the installation, integration, are in the cleanroom. The mechanical structure to hold SHARK-NIR should be assembled and ready to be used.
    1313
    1414**Procedure**
    1515- Carefully integrate the cryostat unit with the derotator-optical bench unit.
    1616- Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks.
    17 - Set up the electronics racks.
     17- Set up the electronics racks in the cleanroom.
    1818
    1919**Templates**
     
    2121**Success criteria**
    2222- The SHARK-NIR is primarily assembled onto the mechanical structure.
     23- The motor electronics rack fits perfectly well at the LBT Platform cabinet (its final destination) shared with iLocater. If not, communicate with the responsible person with the changes required.
    2324- Electronics racks are set up and ready to use.
    2425