Changes between Version 18 and Version 19 of docs/CommissioningPlan/P1.3
- Timestamp:
- 01/18/22 14:49:25 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v18 v19 7 7 8 8 **Description** 9 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets . Move the unit to the cleanroom.9 - Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets, and move the unit to the cleanroom. 10 10 11 11 **Prerequisites** 12 - All the necessary tools and safety features to do the installation, integration, a nd moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).12 - All the necessary tools and safety features to do the installation, integration, are in the cleanroom. The mechanical structure to hold SHARK-NIR should be assembled and ready to be used. 13 13 14 14 **Procedure** 15 15 - Carefully integrate the cryostat unit with the derotator-optical bench unit. 16 16 - Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks. 17 - Set up the electronics racks .17 - Set up the electronics racks in the cleanroom. 18 18 19 19 **Templates** … … 21 21 **Success criteria** 22 22 - The SHARK-NIR is primarily assembled onto the mechanical structure. 23 - The motor electronics rack fits perfectly well at the LBT Platform cabinet (its final destination) shared with iLocater. If not, communicate with the responsible person with the changes required. 23 24 - Electronics racks are set up and ready to use. 24 25