  • docs/CommissioningPlan/P1.3

    v17 v18  
    55- **Recurrence** :      once
    66- **Duration** :        1.5 day
     7
    78**Description**
    89- Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.
     10
    911**Prerequisites**
    1012- All the necessary tools and safety features to do the installation, integration, and moving to the cleanroom. The mechanical structure to hold SHARK-NIR at the cleanroom should be assembled and ready to be used (with the possibility to move to the cleanroom).
     13
    1114**Procedure**
    1215- Carefully integrate the cryostat unit with the derotator-optical bench unit.
    1316- Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks.
    1417- Set up the electronics racks.
     18
    1519**Templates**
    1620
     
    1822- The SHARK-NIR is primarily assembled onto the mechanical structure.
    1923- Electronics racks are set up and ready to use.
     24
    2025**Notes**
    2126