Changes between Version 14 and Version 15 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/03/21 11:35:05 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v14 v15 4 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 5 • **Recurrence** : once 6 • **Duration** : 1 day6 • **Duration** : 1.5 day 7 7 **Description** 8 8 • Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom. … … 12 12 • Carefully integrate the cryostat unit with the derotator-optical bench unit. 13 13 * Before installing the motor electronics rack in the cleanroom, take it to the LBT Platform cabinet (its final destination) shared with iLocater for sanity checks. 14 • Install the electronics cabinet.14 • Set up the electronics racks. 15 15 **Success criteria** 16 16 • The SHARK-NIR is primarily assembled on to the mechanical structure. 17 • Electronics cabinets are installed.17 • Electronics racks are set up and ready to use. 18 18 **Notes** 19 19 20 20 **LBTO support** 21 • Crane operator to lift and move stuff .22 • 1-2 crew to support installation on the mechanical structure.21 • Crane operator to lift and move stuff (mountain bay and/or cleanroom). 22 • 1-2 crew to support installation procedure (mountain bay and/or cleanroom). 23 23 * Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 24 24 * Optical bench and access to the clean tent. … … 29 29 **Comments** 30 30 31 LM: we have to discuss this internally, because some of the procedures are not clear to me. It is called iLocatEr, not iLocatOr. LBTO support should include providing an optical bench and the clean tent [DISCUSS]