Changes between Version 13 and Version 14 of docs/CommissioningPlan/P1.3
- Timestamp:
- 02/02/21 14:23:59 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.3
v13 v14 2 2 • **Phase** : 1 3 3 • **Status** : Draft 4 • **Category** : Unpack, Assemble, Verification, and Installation (C1)4 • **Category** : Unpack, Assemble, and Verification (C1) 5 5 • **Recurrence** : once 6 6 • **Duration** : 1 day … … 22 22 • 1-2 crew to support installation on the mechanical structure. 23 23 * Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed. 24 * Optical bench and access to clean tent.24 * Optical bench and access to the clean tent. 25 25 **Associated SHARK-NIR personnel** 26 26