  • docs/CommissioningPlan/P1.3

    v13 v14  
    22•       **Phase**               :       1 
    33•       **Status**              :       Draft   
    4 •       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)                           
     4•       **Category**            :       Unpack, Assemble, and Verification (C1)
    55•       **Recurrence**  :       once
    66•       **Duration**            :       1 day
     
    2222•       1-2 crew to support installation on the mechanical structure.
    2323* Access to the LBTO electronics cabinet where the motor rack of SHARK-NIR will be installed.
    24 * Optical bench and access to clean tent.
     24* Optical bench and access to the clean tent.
    2525**Associated SHARK-NIR personnel**
    2626