  • docs/CommissioningPlan/P1.3

    v12 v13  
    44•       **Category**            :       Unpack, Assemble, Verification, and Installation (C1)                           
    55•       **Recurrence**  :       once
    6 •       **Duration**            :       half a day
     6•       **Duration**            :       1 day
    77**Description**
    88•       Install and integrate the different SHARK-NIR opto-mechanical components onto the mechanical structure. Install the electronics cabinets. Move the unit to the cleanroom.