== P1.2 Opening boxes and their visual inspection == • **Phase** : 1 • **Status** : Draft • **Category** : Unpack, Assemble, Verification, and Installation (C1) • **Recurrence** : once • **Duration** : half a day **Description** • Unpack the containers/boxes carefully and visually inspect the components inside **Prerequisites** • All the necessary tools and safety features to do the unpacking and moving. **Procedure** • Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. • Visually inspect if all the contents are safe and secure. • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). * Move all needed box contents to the cleanroom. This may require some mounting or handling structures. **Success criteria** • No damage to any container or boxes. **Notes** **LBTO support** • Crane operator to lift and move stuff. • 1-2 crew to support unpacking and moving. **Associated SHARK-NIR personnel** • **Date performed and by whom** **Comments** MB:I would add to move all needed box contents in the clean room. This requires probably some mounting, e.g. of the shark-nir handling used to keep the instrument while integrating cryostat and then making tests [DONE]