== P1.2 Opening of boxes in LBT Hall, inspection of the contents and installation of units on their handlings == - **Phase** : 1 - **Status** : Draft - **Category** : Unpack, Assemble, and Verification (C1) - **Recurrence** : once - **Duration** : 1 day **Description** - Unpack the containers/boxes carefully and visually inspect the components inside. **Prerequisites** - All the necessary tools and safety features to unpack and move. **Procedure** - Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. - Visually inspect if all the contents are safe and secure. - Inspect if the tilt and shock sensors are activated or not. - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). - Set up the handlings for the cryostat and the optical bench. Install the corresponding onto the handling and move to the cleanroom. **Templates** **Success criteria** - No damage to any container or boxes. - No shock sensors activated. **Notes** **LBTO support** - Crane operator (mountain bay) to lift and move stuff. - 1-2 crew to support unpacking and to move. **Date performed and by whom**