  • docs/CommissioningPlan/P1.2

    v25 v26  
    4444- Marco cleaned the rust out of the 2 parts (this was already seen partially in Padova after packing the box), put silicone on them, and re-placed them in Box-6. Later in the afternoon Jacopo and Marco placed all extra pieces from box-7 into box-6. Box-6 is now equipped with wheels.
    4545- unpacked Box-7, and took out SHARK-NIR handling and the rest of the parts. The ties used to keep in place the metal parts on the bottom were all broken, but parts were shifted by a few cms and no issues were seen.
    46 - Box-16: Davide installed the two workstations into server room B with the help of LeRoy. After a bit of misunderstanding, we are quite sure that the subnet will be 192.168.61.X as foreseen. When Sasha workstation arrives, it will be initially mounted on the clean room rack because of the missing mono-mode fiber connection from the server room.
    4746- SHARK-NIR was installed onto its handling thanks to LBT crew support
    4847- The Ultrashock Sensor that was mounted on the Instrument provided the following data: