Changes between Version 21 and Version 22 of docs/CommissioningPlan/P1.2
- Timestamp:
- 02/09/22 19:33:51 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.2
v21 v22 8 8 9 9 **Description** 10 - Unpack the containers/boxes carefully and visually inspect the components inside.10 - Unpack the boxes carefully and visually inspect the components inside. 11 11 12 12 **Prerequisites** … … 14 14 15 15 **Procedure** 16 - Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components.16 - Carefully unpack the boxes containing the SHARK-NIR opto-mechanical components. 17 17 - Visually inspect if all the contents are safe and secure. 18 18 - Inspect if the tilt and shock sensors are activated or not. 19 19 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 20 - Set up the handlings for the cryostat and the optical bench. Install the corresponding onto the handling and move to the cleanroom.20 - Set up the handlings for the cryostat and the optical bench. Install the corresponding onto the handling. 21 21 22 22 **Templates** 23 23 24 24 **Success criteria** 25 - No damage to any container orboxes.25 - No damage to any boxes. 26 26 - No shock or tilt sensors were activated (TBD). 27 27