Changes between Version 17 and Version 18 of docs/CommissioningPlan/P1.2
- Timestamp:
- 01/18/22 14:40:06 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.2
v17 v18 8 8 9 9 **Description** 10 - Unpack the containers/boxes carefully and visually inspect the components inside 10 - Unpack the containers/boxes carefully and visually inspect the components inside. 11 11 12 12 **Prerequisites** 13 - All the necessary tools and safety features to do the unpacking and moving.13 - All the necessary tools and safety features to unpack and move. 14 14 15 15 **Procedure** … … 18 18 - Inspect if the tilt and shock sensors are activated or not. 19 19 - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 20 - Set up the handlings for the cryostat and the optical bench. install the corresponding onto the handling and move to the cleanroom.20 - Set up the handlings for the cryostat and the optical bench. Install the corresponding onto the handling and move to the cleanroom. 21 21 22 22 **Templates** … … 30 30 **LBTO support** 31 31 - Crane operator (mountain bay) to lift and move stuff. 32 - 1-2 crew to support unpacking and moving.32 - 1-2 crew to support unpacking and to move. 33 33 34 34 **Date performed and by whom**