Changes between Version 12 and Version 13 of docs/CommissioningPlan/P1.2


Ignore:
Timestamp:
02/03/21 17:58:44 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.2

    v12 v13  
    1414* Inspect if the tilt and shock sensors are activated or not.
    1515•       Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed).
    16 * Set up the handlings for the cyostat and the optical bench. install the corresponding onto the handling and move to the cleanroom.
     16* Set up the handlings for the cryostat and the optical bench. install the corresponding onto the handling and move to the cleanroom.
    1717
    1818**Success criteria**
     
    2929
    3030**Comments**
    31 
    32 LM: Same here about the tilt and shock sensor, as I would place some of them also inside the boxes. [DONE]