v10 v11 12 12 • Carefully unpack the containers/boxes containing the SHARK-NIR opto-mechanical components. 13 13 • Visually inspect if all the contents are safe and secure. 14 * Inspect if the tilt and shock sensors are activated or not. 14 15 • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). 15 16 * Set up the handlings for the cyostat and the optical bench. install the corresponding onto the handling and move to the cleanroom. … … 17 18 **Success criteria** 18 19 • No damage to any container or boxes. 20 * No shock sensors activated. 19 21 **Notes** 20 22 … … 28 30 **Comments** 29 31 30 LM: Same here about the tilt and shock sensor, as I would place some of them also inside the boxes. 32 LM: Same here about the tilt and shock sensor, as I would place some of them also inside the boxes. [DONE]