== P1.1 Inspection of the boxes == • **Phase** : 1 • **Status** : Draft • **Category** : Unpack, Assemble, Verification (C1) • **Recurrence** : once (when SHARK-NIR reaches LBT) • **Duration** : half a day **Description** • Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay **Prerequisites** • All the SHARK-NIR containers and boxes should be at LBT mountain bay **Procedure** • Visually inspect if all the SHARK-NIR containers and boxes at the LBT mountain bay are safe and secure. * Inspection of the state of tilt and shock sensor. • Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). **Success criteria** • No damage to any container or boxes. * No shock sensors activated. **Notes** **LBTO support** • Crane operator to lift and move stuff. • 1-2 crew to support moving containers/boxes. **Associated SHARK-NIR personnel** **Date performed and by whom** **Comments** LM: I would add in the Procedure an inspection of the state of tilt and shock sensor and in the success criteria that these sensors must not be activated. [DONE]