== P1.1 Inspection of the closed boxes == - **Phase** : 1 - **Status** : Draft - **Category** : Unpack, Assemble, and Verification (C1) - **Recurrence** : once (when SHARK-NIR reaches LBT) - **Duration** : 0.5 day **Description** - Visual inspection of all the SHARK-NIR containers and boxes at the LBT mountain bay **Prerequisites** - All the SHARK-NIR containers and boxes should be at LBT mountain bay **Procedure** - Visually inspect if all the SHARK-NIR containers and boxes at the LBT mountain bay are safe and secure. - Inspection of the state of tilt and shock sensor. - Check if there is any damage to any part of the shipment. If yes, note them, take photos, and communicate to the respective insurance party (if needed). **Templates** **Success criteria** - No damage to any container or boxes. - No shock sensors activated. **Notes** - See AD10 for more details. **LBTO support** - Crane operator (mountain bay) to lift and move stuff (TBD). - 1-2 crew to support moving containers/boxes. **Date performed and by whom**