Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.10
- Timestamp:
- 02/03/21 17:49:41 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.10
v5 v6 1 == P1.10 Testing of SCICAM image grabbing by SOUL-AO ==1 == P1.10 Verification of the operability of the motors & light sources and looking for filter defects/artifacts == 2 2 • **Phase** : 1 3 • **Status** : Draft 3 • **Status** : Draft 4 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 5 • **Recurrence** : once 6 • **Duration** : 2 days6 • **Duration** : 1.5 7 7 **Description** 8 • Testing the SCICAM imaging grabbing (from a repository/folder) by SOUL-AO which is a pre-requisite for the SOUL-AO optimization for SHARK-NIR8 • Checking the working of motors and light sources within SHARK-NIR using optical feedback. Finding the filter defects/artifacts using an internal calibration source (flat-field) within the instrument. 9 9 **Prerequisites** 10 • ICE compatibility between SHARK-NIR and SOUL-AO system 11 * SCICAM image should have a header following FITS standard 10 • SHARK-NIR connected to LBT network. 11 • Electronics racks on. 12 • DM best shape uploaded (shape minimizing internal aberrations) 13 • The cryostat should be running and cooled down. 12 14 **Procedure** 13 • Save a SCICAM image (with a PSF image) on the agreed folder or repository 14 • Check if SOUL-AO can grab the image and analyze the PSF 15 • When the services are up and running, after the motors are homed, each of the individual motors is individually tested for their different named/nominal positions. 16 • The light sources within SHARK-NIR are used simultaneously to check the working of the motors looking at the optical feedback. 17 * Check the CRED-2 and ALPAO-DM SW and optical feedback. 18 * Take the images of all the filters using the internal calibration source (flat-field) within the instrument to locate/find out the filter defects/artifacts, if any. You may take short- and long-exposures to get better contrast of the features if required. 19 15 20 **Success criteria** 16 • SOUL-AO SW can grab the SCICAM image 21 • All the motors can reach the named positions / nominal positions. 22 • All the light sources are working and confirmed through optical feedback at the SCICAM. 23 * CRED-2 AND ALPAO-DM working normally. 24 • All the filter images saved. 25 17 26 **Notes** 18 27 19 * Points of contact: Alfio and Fabio from Arcetri20 21 28 **LBTO support** 22 23 * LBTO SW support may be required24 29 25 30 **Associated SHARK-NIR personnel** 26 31 27 32 **Date performed and by whom** 33 34 35 **Comments** 36 * KR: add the filter monitoring routine check.