Changes between Version 11 and Version 12 of docs/CommissioningPlan/P1.10
- Timestamp:
- 01/14/22 12:54:19 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.10
v11 v12 1 1 == P1.10 NCPA routine verification == 2 • **Phase** : 1 3 • **Status** : Draft 4 • **Category** : Unpack, Assemble, and Verification (C1) 5 • **Recurrence** : once at commissioning 6 • **Duration** : 0.5 day 2 3 - **Phase** : 1 4 - **Status** : Draft 5 - **Category** : Unpack, Assemble, and Verification (C1) 6 - **Recurrence** : once at commissioning 7 - **Duration** : 0.5 day 8 7 9 **Description** 8 • Check the working of the internal NCPA routine (phase diversity + wollastone(DI-DBI))10 - Check the working of the internal NCPA routine (phase diversity + Wollaston (DI-DBI)) 9 11 10 12 **Prerequisites** 11 •SCICAM cooled down.13 - SCICAM cooled down. 12 14 13 15 **Procedure** 14 • Run the Phase-diversity routine using the images taken with the SHARK-NIR internal calibration sources to measure the NCPA within (excluding the deployable arm) 16 - Run the Phase-diversity routine using the images taken with the SHARK-NIR internal calibration sources to measure the NCPA within (excluding the deployable arm) 17 18 **Templates** 15 19 16 20 **Success criteria** 17 *Internal NCPA routine works fine and the PSF shows improvement in its quality.21 - Internal NCPA routine works fine and the PSF shows improvement in its quality. 18 22 19 23 **Notes** 20 24 21 25 **LBTO support** 22 * Liquid Nitrogen refill is required in the cleanroom. 23 24 **Associated SHARK-NIR personnel** 26 - Liquid Nitrogen refill is required in the cleanroom. 25 27 26 28 **Date performed and by whom** 27 28 **Comments**