| 49 | ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||'''SHARK-NIR Location'''|| |
| 50 | ||P2.1||Activating the instrument and testing instrument states & transitions||Day||60 ||60||C2||Verify the working of emergency button||LBT platform|| |
| 51 | ||P2.2||Instrument operability and performance||Day||180||180||C2||-||LBT platform|| |
| 52 | ||P2.3||TCS communication test||Day||60||60||C2||Authorise SHARK-NIR, connecting to ASM+LBTI AO system, able to send preset, receiving LBT telemetry and details for the fitswriter||LBT platform|| |
| 53 | ||P2.4||Align SHARK-NIR to the telescope||Day||120||120||C2||Mounting RR on the SX side. Support from LBTI?||LBT platform|| |
| 54 | ||P2.5||Synergy with LBTI AO system test||Day||120||120||C2||Mounting RR on the SX side. Support from LBTI for AO running||LBT platform|| |
| 55 | ||P2.6||Measurement of NCPA||Day||180||180||C3||Mounting RR on the SX side, Support from LBTI for AO running||LBT platform|| |
| 56 | ||P2.7||Looking for filter defects/effects/features||Day||60||60||C2||Support from LBTI for AO running||LBT platform|| |
| 57 | ||P2.8||Flexure tests||Day||180||180||C2||Support from LBTI for AO running||LBT platform|| |
| 58 | ||P2.9||Nighttime acquisition and setting telescope collimation for night||Night||180||180||C4||Support from LBTI for AO running||LBT platform|| |