Changes between Version 3 and Version 4 of docs/CommissioningActivityList


Ignore:
Timestamp:
03/04/20 14:55:00 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningActivityList

    v3 v4  
    4747== Phase 2 ==
    4848
     49||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||'''SHARK-NIR Location'''||   
     50||P2.1||Activating the instrument and testing instrument states & transitions||Day||60  ||60||C2||Verify the working of emergency button||LBT platform||
     51||P2.2||Instrument operability and performance||Day||180||180||C2||-||LBT platform||
     52||P2.3||TCS communication test||Day||60||60||C2||Authorise SHARK-NIR, connecting to ASM+LBTI AO system, able to send preset, receiving LBT telemetry and details for the fitswriter||LBT platform||
     53||P2.4||Align SHARK-NIR to the telescope||Day||120||120||C2||Mounting RR on the SX side. Support from LBTI?||LBT platform||
     54||P2.5||Synergy with LBTI AO system test||Day||120||120||C2||Mounting RR on the SX side. Support from LBTI for AO running||LBT platform||
     55||P2.6||Measurement of NCPA||Day||180||180||C3||Mounting RR on the SX side, Support from LBTI for AO running||LBT platform||
     56||P2.7||Looking for filter defects/effects/features||Day||60||60||C2||Support from LBTI for AO running||LBT platform||
     57||P2.8||Flexure tests||Day||180||180||C2||Support from LBTI for AO running||LBT platform||
     58||P2.9||Nighttime acquisition and setting telescope collimation for night||Night||180||180||C4||Support from LBTI for AO running||LBT platform||
    4959
    5060== Phase 3 ==